Quick calculation
Cost, capacity and payback
Change the core assumptions on one screen and review capacity limits and operating cash.
Open quick calculationDecision support tool
Evaluate roll cost, theoretical capacity, monthly operating cash and payback in one place.
Feasibility options
Use the quick model for an initial review, or the detailed Turkish report tool when preparing a support, finance or business-plan file.
Quick calculation
Change the core assumptions on one screen and review capacity limits and operating cash.
Open quick calculationDetailed feasibility and report
Use the Turkish detailed tool covering product, material, sales channels, finance, 12-month projection, NPV and IRR; save the study and create a printable report.
Open detailed report tool (Turkish) The output does not guarantee support approval. Verify the current format and conditions required by the relevant institution.What is calculated?
Variable cost from film weight, waste, core, label and packaging.
Speed, roll change, working time, efficiency and simultaneous winding count.
Operating performance is shown separately from financing payments.
Validate the result with us